The list price covers these works
- Electrical and Plumbing Installation
- Installation of Interior Panel Doors
- Interior and Exterior Painting
- Window Installation (Handed Over Ready to Use)
- Prefab House Assembly
- Socket, Switch and Light Fitting Installation
Concrete foundation, transport, crane and plot-specific work (plinth, utilities, veranda) are shown as separate items in the written quote.
What a 45 m² 2+1 layout gives you
This single-storey prefab house fits two separate rooms, a living room, a kitchen and one bathroom into 45 m². In Turkish listings, "2+1" means two bedrooms plus a living room, and that is exactly the point here: on a small footprint you get a second room with a door you can close, rather than one larger open space.
The floor plan lists a 10 m² main bedroom, a 6 m² second room, a 14 m² living room, a 5 m² kitchen and a 4 m² bathroom. The 6 m² room is compact: realistic for a single bed, a desk with shelving, a nursery, a small guest room or a dressing and storage room, but tight for a double bed with large wardrobes.
Who the 45 m² model suits
- Small families who need a child's room
- Couples who want a separate home office
- Owners of a small plot who want more rooms rather than more floor area
- A holiday, weekend or vineyard house, a guest house or staff accommodation
- A separate room for an elderly family member
If you would rather have a larger living room and bedroom at roughly the same size, compare the 1+1 models with 40 m² or 49 m². If a second room matters in everyday life, this 2+1 plan is the better fit.
Plan the furniture before you order
Because 45 m² is divided into three main areas, measure your furniture against the floor plan: door swings, the space in front of windows, socket positions and kitchen appliances all decide how much usable space is left. Space-saving sofas, a wall-mounted TV unit, a folding dining table, sliding wardrobes and beds with storage make a real difference. Any change to doors, windows or partitions must be checked by the technical team before production, as changes affecting the structure or service points can alter scope and cost.







